The 5 tons construction waste incinerator is a medium-capacity thermal treatment system specifically engineered for construction and demolition (C&D) waste management. This advanced incineration solution combines efficient waste processing with environmental protection features, making it ideal for large construction projects and waste management facilities.
● Processing Capacity: 5 tons per day (adjustable based on waste composition)
● Combustion System:
◎ Primary chamber: 600-850°C (pyrolysis zone)
◎ Secondary chamber: 950-1100°C (complete combustion)
◎ Residence time: ≥2 seconds in secondary chamber
● Dimensions: 6.5m(L)×2.8m(W)×3.2m(H)
● Fuel Consumption: 15-25L diesel/hour (depending on waste calorific value)
● Power Requirement: 25kW (three-phase)
◎ Underfire air for primary combustion
◎ Overfire air for complete burnout
◎ Induced draft fan for flue gas extraction
◎ Touchscreen PLC interface
◎ Real-time temperature monitoring
◎ Automatic alarm and shutdown protection
◎ Cyclone dust collector (removes >90% of particulates)
◎ Semi-dry scrubber (acid gas removal efficiency >85%)
◎ Activated carbon injection (dioxin control)
The construction sector generates approximately 30% of all waste globally. The 5-ton incinerator addresses this challenge by:
● Reducing landfill dependence: Converts 5 tons of waste daily into minimal ash (volume reduction >90%)
● Handling diverse waste streams:
◎ Non-recyclable wood (painted/treated)
◎ Plastic packaging and insulation materials
◎ Contaminated demolition debris
◎ Paper and cardboard waste
Cost Comparison (Annual Basis for Medium Project):
Cost Factor |
Traditional Disposal |
5-Ton Incinerator |
Disposal Fees |
$180,000 |
$40,000 |
Transportation |
$75,000 |
$15,000 |
Regulatory Fines |
$30,000 (risk) |
$0 |
Total |
$285,000 |
$55,000 |
● Potential energy recovery (heat for site offices/drying)
● Improved site safety by eliminating waste stockpiles
● Enhanced project sustainability credentials
Meets international standards including:
● EU Waste Incineration Directive (2000/76/EC)
● US EPA Clean Air Act requirements
● China GB18485-2014 for waste incineration
Emission Performance:
● Particulate Matter: <30mg/Nm³
● HCl: <50mg/Nm³
● CO: <100mg/Nm³
● Dioxins: <0.1ng TEQ/Nm³
Step-by-Step Process:
◎ Manual sorting (removal of metals, large inert materials)
◎ Shredding (for uniform particle size)
◎ Automatic feeding system
◎ Two-stage controlled burning
◎ Ash removal via wet discharger
◎ Flue gas cooling
◎ Multi-stage purification
◎ Continuous monitoring
● Location: Bangkok, Thailand
● Duration: 18 months
● Daily Waste Generated: 4.2 tons
● Waste management cost reduction: 68%
● On-site space recovery: 350m² previously used for waste storage
● CO2 emissions reduction: Equivalent to 75 tons annually
● Project LEED certification points: +2 for innovative waste management
● Daily: Ash removal and combustion chamber inspection
● Weekly: Scrubbing system check
● Monthly: Full system maintenance
● 24/7 remote monitoring available
● On-site technician dispatch within 48 hours
● Annual performance certification
The 5 tons construction waste incinerator represents an optimal solution for modern construction projects seeking to:
✓ Dramatically reduce waste management costs
✓ Improve environmental compliance
✓ Enhance site operational efficiency
✓ Contribute to circular economy goals
With its balanced capacity and advanced pollution control, this system fills a crucial gap between small-scale burners and industrial-sized units, making it the ideal choice for medium-sized construction projects and waste processing centers.
Address
Qiqiao Town Economic Development Zone, Botou City, Hebei Province, China
Tel