Beijing Hongsheng Hangkai Environmental Protection Technology Co., Ltd.
Beijing Hongsheng Hangkai Environmental Protection Technology Co., Ltd.
Products
300kg Construction Waste Incinerator
  • 300kg Construction Waste Incinerator300kg Construction Waste Incinerator
  • 300kg Construction Waste Incinerator300kg Construction Waste Incinerator

300kg Construction Waste Incinerator

The 300kg construction waste incinerator is a compact, efficient thermal treatment system designed for small construction projects, renovation sites, and temporary work locations. This portable unit provides an environmentally responsible method for disposing of non-hazardous construction debris on-site, eliminating the need for costly waste transportation and reducing landfill dependency.

The 300kg construction waste incinerator is a compact, efficient thermal treatment system designed for small construction projects, renovation sites, and temporary work locations. This portable unit provides an environmentally responsible method for disposing of non-hazardous construction debris on-site, eliminating the need for costly waste transportation and reducing landfill dependency.

Key Specifications

● Capacity: 300kg per batch (4-6 batches/day possible)

● Dimensions: 2.1m (L) × 1.5m (W) × 1.8m (H)

● Combustion Temperature: 800-1000°C

● Fuel Type: Diesel or waste-derived oils

● Power Requirement: 5kW (standard 220V)

● Ash Residual: <5% of input volume

Technical Features

● Dual-Chamber Design:

◎ Primary chamber for waste loading and initial combustion

◎ Secondary chamber for complete burnout (residence time ≥1.5 seconds)

● Basic Emission Control:

◎ Water spray dust suppression

◎ Simple baffle filter for particulate reduction

● Operational Simplicity:

◎ Manual loading door

◎ Analog temperature gauges

◎ Emergency stop button

300kg Construction Waste Incinerator Target Applications

1 Small Construction Projects

● Home renovations (drywall, wood, packaging materials)

● Shop fit-outs (display materials, temporary structures)

● Minor demolition work (non-asbestos containing materials)

2 Remote Location Operations

● Infrastructure maintenance (bridge/road repair teams)

● Disaster recovery (temporary debris processing)

3 Specialty Contractors

● Landscaping companies (treated wood, green waste)

● Event construction (temporary staging materials)

300kg Construction Waste Incinerator Operational Advantages

1 Cost Efficiency

● Eliminates hauling costs: Saves 150−150−300/ton in disposal fees

● No permit requirements (for non-hazardous waste in most regions)

● Minimal maintenance: Only requires daily ash removal

2 Environmental Benefits

● 90% volume reduction vs. landfilling

● Prevents illegal dumping common on small job sites

● Lower carbon footprint than multiple waste transport trips

3 Practical Features

● Mobility: Forklift pockets for easy relocation

● Quick setup: Operational within 2 hours of delivery

● Adaptable combustion: Handles mixed waste streams

300kg Construction Waste Incinerator Performance Data

Parameter

Measurement

Average Processing Time

45-60 minutes/batch

Fuel Consumption

3-5L diesel/batch

Daily Capacity

1.2-1.8 tons (with continuous operation)

Particulate Emissions

<150mg/Nm³

300kg Construction Waste Incinerator Comparison with Alternative Solutions

Method

300kg Incinerator

Skip Bin

Landfill

Cost per ton

$80

$120

$150

Processing Time

Immediate

2-3 day wait

Weeks

Space Needed

4m²

10m²

N/A

Environmental Control

Moderate

None

Poor

300kg Construction Waste Incinerator Safety Considerations

● Operator requirements: Basic 1-hour training

● Safety features:

◎ Thermal overload protection

◎ Flame failure detection

◎ Grounding protection

● Site requirements:

◎ 5m clearance from structures

◎ Non-combustible base

300kg Construction Waste Incinerator Maintenance Protocol

1. Daily:

◎ Remove ash deposits

◎ Check fuel lines

2. Weekly:

◎ Inspect refractory lining

◎ Clean air nozzles

3. Annually:

◎ Replace combustion chamber bricks

◎ Professional emission test

300kg Construction Waste Incinerator Limitations

● Not suitable for:

◎ Hazardous materials

◎ Metal-dominated waste

◎ Wet waste (>30% moisture)

● Regulatory note: Some municipalities require notification before use

300kg Construction Waste Incinerator Case Example

Project: Downtown café renovation

Waste Type: Demolition wood, packaging, drywall

Results:

● Eliminated 12 skip bin orders ($5,400 savings)

● Completed waste processing within project timeline

● Received LEED credit for on-site waste management

300kg Construction Waste Incinerator Conclusion

The 300kg construction waste incinerator provides small contractors and renovation specialists with:

✔ Immediate on-site waste solution

✔ Significant cost savings versus traditional disposal

✔ Basic environmental protection

✔ Unmatched convenience for mobile operations

While not appropriate for large projects or hazardous materials, this compact unit fills a crucial niche in small-scale construction waste management, particularly where speed and convenience are prioritized over advanced emission controls.


Hot Tags: 300kg Construction Waste Incinerator
Send Inquiry
Contact Info
Welcome to our website! For inquiries about our products or pricelist, please leave your email to us and we will be in touch within 24 hours.
X
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy
Reject Accept