The 300kg construction waste incinerator is a compact, efficient thermal treatment system designed for small construction projects, renovation sites, and temporary work locations. This portable unit provides an environmentally responsible method for disposing of non-hazardous construction debris on-site, eliminating the need for costly waste transportation and reducing landfill dependency.
● Capacity: 300kg per batch (4-6 batches/day possible)
● Dimensions: 2.1m (L) × 1.5m (W) × 1.8m (H)
● Combustion Temperature: 800-1000°C
● Fuel Type: Diesel or waste-derived oils
● Power Requirement: 5kW (standard 220V)
● Ash Residual: <5% of input volume
● Dual-Chamber Design:
◎ Primary chamber for waste loading and initial combustion
◎ Secondary chamber for complete burnout (residence time ≥1.5 seconds)
● Basic Emission Control:
◎ Water spray dust suppression
◎ Simple baffle filter for particulate reduction
● Operational Simplicity:
◎ Manual loading door
◎ Analog temperature gauges
◎ Emergency stop button
● Home renovations (drywall, wood, packaging materials)
● Shop fit-outs (display materials, temporary structures)
● Minor demolition work (non-asbestos containing materials)
● Infrastructure maintenance (bridge/road repair teams)
● Disaster recovery (temporary debris processing)
● Landscaping companies (treated wood, green waste)
● Event construction (temporary staging materials)
● Eliminates hauling costs: Saves 150−150−300/ton in disposal fees
● No permit requirements (for non-hazardous waste in most regions)
● Minimal maintenance: Only requires daily ash removal
● 90% volume reduction vs. landfilling
● Prevents illegal dumping common on small job sites
● Lower carbon footprint than multiple waste transport trips
● Mobility: Forklift pockets for easy relocation
● Quick setup: Operational within 2 hours of delivery
● Adaptable combustion: Handles mixed waste streams
Parameter |
Measurement |
Average Processing Time |
45-60 minutes/batch |
Fuel Consumption |
3-5L diesel/batch |
Daily Capacity |
1.2-1.8 tons (with continuous operation) |
Particulate Emissions |
<150mg/Nm³ |
Method |
300kg Incinerator |
Skip Bin |
Landfill |
Cost per ton |
$80 |
$120 |
$150 |
Processing Time |
Immediate |
2-3 day wait |
Weeks |
Space Needed |
4m² |
10m² |
N/A |
Environmental Control |
Moderate |
None |
Poor |
● Operator requirements: Basic 1-hour training
● Safety features:
◎ Thermal overload protection
◎ Flame failure detection
◎ Grounding protection
● Site requirements:
◎ 5m clearance from structures
◎ Non-combustible base
◎ Remove ash deposits
◎ Check fuel lines
◎ Inspect refractory lining
◎ Clean air nozzles
◎ Replace combustion chamber bricks
◎ Professional emission test
● Not suitable for:
◎ Hazardous materials
◎ Metal-dominated waste
◎ Wet waste (>30% moisture)
● Regulatory note: Some municipalities require notification before use
Project: Downtown café renovation
Waste Type: Demolition wood, packaging, drywall
Results:
● Eliminated 12 skip bin orders ($5,400 savings)
● Completed waste processing within project timeline
● Received LEED credit for on-site waste management
The 300kg construction waste incinerator provides small contractors and renovation specialists with:
✔ Immediate on-site waste solution
✔ Significant cost savings versus traditional disposal
✔ Basic environmental protection
✔ Unmatched convenience for mobile operations
While not appropriate for large projects or hazardous materials, this compact unit fills a crucial niche in small-scale construction waste management, particularly where speed and convenience are prioritized over advanced emission controls.