Beijing Hongsheng Hangkai Environmental Protection Technology Co., Ltd.
Beijing Hongsheng Hangkai Environmental Protection Technology Co., Ltd.
Products
500kg Construction Waste Incinerator
  • 500kg Construction Waste Incinerator500kg Construction Waste Incinerator

500kg Construction Waste Incinerator

The 500kg construction waste incinerator is a robust, medium-capacity thermal treatment system designed specifically for small to medium construction projects and demolition sites. This semi-automated unit combines efficient waste processing capabilities with enhanced environmental controls, offering a practical solution for on-site construction waste management.

The 500kg construction waste incinerator is a robust, medium-capacity thermal treatment system designed specifically for small to medium construction projects and demolition sites. This semi-automated unit combines efficient waste processing capabilities with enhanced environmental controls, offering a practical solution for on-site construction waste management.

Technical Specifications:

● Capacity: 500kg per batch (3-4 batches/day recommended)

● Dimensions: 2.8m(L) × 1.8m(W) × 2.2m(H)

● Combustion System:

◎ Primary chamber: 750-950°C

◎ Secondary chamber: 1000-1100°C (1.8 second residence time)

● Fuel System:

◎ Dual-fuel capability (diesel/waste oil)

◎ Consumption: 6-8L/hour

● Power Requirement: 8kW (380V three-phase)

● Ash Residual: 3-7% of input volume

Advanced Features:

1. Enhanced Combustion Design:

◎ Reciprocating grate system for better waste agitation

◎ Forced air supply with adjustable nozzles

◎ Thermal retention lining (150mm refractory)

2. Improved Emission Control:

◎ Dry sorbent injection (for acid gas neutralization)

◎ Multi-cyclone particulate collector

◎ Basic flue gas recirculation

3. Operational Upgrades:

◎ Digital control panel with temperature graphing

◎ Over-temperature automatic water quench

◎ Integrated ash removal drawer

500kg Construction Waste Incinerator Target Applications

1 Construction & Demolition Projects

● Medium-sized renovations (apartment complexes, office buildings)

● Selective demolition (interior strip-outs)

● Infrastructure repair (bridge components, road barriers)

2 Specialized Waste Streams

● Wood processing waste (pallets, formwork, treated timber)

● Composite materials (laminate flooring, window frames)

● Temporary structure disposal (site offices, event stages)

500kg Construction Waste Incinerator Performance Advantages

1 Operational Efficiency

● Batch processing time: 50-70 minutes (including cooling)

● Daily throughput: 1.5-2 tons (with 8-hour operation)

● Fuel efficiency: 10-12kg waste/L diesel

2 Economic Benefits

● Cost comparison (vs traditional disposal for 2-ton daily waste):

◎ Incinerator: $120/day (fuel + maintenance)

◎ Skip bins: $240/day (including transport)

◎ Savings potential: $3,600/month

3 Environmental Compliance

● Meets basic international standards:

◎ EU Stage II non-hazardous waste requirements

◎ US EPA Small Incinerator Guidelines

◎ ASEAN Construction Waste Management Protocols

● Emission performance:

◎ Particulates: <100mg/Nm³

◎ CO: <150mg/Nm³

◎ HCl: <60mg/Nm³

500kg Construction Waste Incinerator Operational Workflow

1 Pre-Operation Requirements

● Site preparation (3×4m level concrete pad)

● Local authority notification (where required)

● Basic operator training (4-hour certification)

2 Standard Operating Procedure

1. Waste preparation:

◎ Remove large metal components

◎ Break down oversize materials

2. Loading:

◎ Manual loading via side door

◎ 3/4 chamber fill recommendation

3. Combustion cycle:

◎ 20-minute ignition phase

◎ 30-40 minute main burn

◎ 10-minute cool-down

500kg Construction Waste Incinerator Comparison with Alternative Solutions

Feature

500kg Incinerator

Mobile Shredder

Traditional Disposal

Capital Cost

$28,000

$75,000

N/A

Operating Cost/ton

$80

$120

$150

Space Needed

6m²

10m²

N/A

Processing Time

Immediate

1 day

3-7 days

Volume Reduction

93%

60%

0%


500kg Construction Waste Incinerator Maintenance Requirements

Daily:

● Ash removal and disposal

● Burner nozzle inspection

● Temperature sensor verification

Monthly:

● Refractory lining inspection

● Fan motor lubrication

● Fuel system check

Annual:

● Complete emission system overhaul

● Structural integrity certification

● Control system recalibration

500kg Construction Waste Incinerator Safety Systems

● Automatic shutdown triggers:

◎ Over-temperature (≥1150°C)

◎ Loss of combustion air

◎ Fuel supply failure

● Physical safeguards:

◎ Double-walled insulation

◎ Emergency dump chute

◎ Ground-fault protected electricals

500kg Construction Waste Incinerator Real-World Application Case

Project: Shopping Mall Refurbishment

Location: Kuala Lumpur, Malaysia

Duration: 4 months

Waste Processed: 1.8 tons/day (mainly packaging, temporary walls, flooring)

Results:

● Cost reduction: 55% vs traditional disposal

● Space recovery: Eliminated 6m² daily waste accumulation

● Project timeline: No disposal-related delays

● Sustainability: Contributed to Green Building Index points

500kg Construction Waste Incinerator Limitations & Considerations

● Not suitable for:

◎ Wet waste (>25% moisture)

◎ Asbestos-containing materials

◎ Electronic waste components

● Regulatory note:

◎ Some urban areas require advance permits

◎ Daily operation logs mandatory

500kg Construction Waste Incinerator Conclusion

The 500kg construction waste incinerator delivers an optimal balance of:

✔ Practical capacity for medium projects

✔ Enhanced combustion efficiency versus smaller units

✔ Basic environmental controls exceeding open burning

✔ Significant cost savings over outsourced disposal

This system represents the ideal solution for general contractors and demolition specialists needing reliable, on-demand waste processing without the complexity of industrial-scale systems. Its combination of portability, improved combustion technology, and operational simplicity makes it particularly valuable for:

● Fast-track projects with tight schedules

● Sites with limited waste storage space

● Companies pursuing sustainability certifications


Hot Tags: 500kg Construction Waste Incinerator
Send Inquiry
Contact Info
Welcome to our website! For inquiries about our products or pricelist, please leave your email to us and we will be in touch within 24 hours.
X
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy
Reject Accept