The 500kg construction waste incinerator is a robust, medium-capacity thermal treatment system designed specifically for small to medium construction projects and demolition sites. This semi-automated unit combines efficient waste processing capabilities with enhanced environmental controls, offering a practical solution for on-site construction waste management.
● Capacity: 500kg per batch (3-4 batches/day recommended)
● Dimensions: 2.8m(L) × 1.8m(W) × 2.2m(H)
● Combustion System:
◎ Primary chamber: 750-950°C
◎ Secondary chamber: 1000-1100°C (1.8 second residence time)
● Fuel System:
◎ Dual-fuel capability (diesel/waste oil)
◎ Consumption: 6-8L/hour
● Power Requirement: 8kW (380V three-phase)
● Ash Residual: 3-7% of input volume
◎ Reciprocating grate system for better waste agitation
◎ Forced air supply with adjustable nozzles
◎ Thermal retention lining (150mm refractory)
◎ Dry sorbent injection (for acid gas neutralization)
◎ Multi-cyclone particulate collector
◎ Basic flue gas recirculation
◎ Digital control panel with temperature graphing
◎ Over-temperature automatic water quench
◎ Integrated ash removal drawer
● Medium-sized renovations (apartment complexes, office buildings)
● Selective demolition (interior strip-outs)
● Infrastructure repair (bridge components, road barriers)
● Wood processing waste (pallets, formwork, treated timber)
● Composite materials (laminate flooring, window frames)
● Temporary structure disposal (site offices, event stages)
● Batch processing time: 50-70 minutes (including cooling)
● Daily throughput: 1.5-2 tons (with 8-hour operation)
● Fuel efficiency: 10-12kg waste/L diesel
● Cost comparison (vs traditional disposal for 2-ton daily waste):
◎ Incinerator: $120/day (fuel + maintenance)
◎ Skip bins: $240/day (including transport)
◎ Savings potential: $3,600/month
● Meets basic international standards:
◎ EU Stage II non-hazardous waste requirements
◎ US EPA Small Incinerator Guidelines
◎ ASEAN Construction Waste Management Protocols
● Emission performance:
◎ Particulates: <100mg/Nm³
◎ CO: <150mg/Nm³
◎ HCl: <60mg/Nm³
● Site preparation (3×4m level concrete pad)
● Local authority notification (where required)
● Basic operator training (4-hour certification)
◎ Remove large metal components
◎ Break down oversize materials
◎ Manual loading via side door
◎ 3/4 chamber fill recommendation
◎ 20-minute ignition phase
◎ 30-40 minute main burn
◎ 10-minute cool-down
Feature |
500kg Incinerator |
Mobile Shredder |
Traditional Disposal |
Capital Cost |
$28,000 |
$75,000 |
N/A |
Operating Cost/ton |
$80 |
$120 |
$150 |
Space Needed |
6m² |
10m² |
N/A |
Processing Time |
Immediate |
1 day |
3-7 days |
Volume Reduction |
93% |
60% |
0% |
Daily:
● Ash removal and disposal
● Burner nozzle inspection
● Temperature sensor verification
Monthly:
● Refractory lining inspection
● Fan motor lubrication
● Fuel system check
Annual:
● Complete emission system overhaul
● Structural integrity certification
● Control system recalibration
● Automatic shutdown triggers:
◎ Over-temperature (≥1150°C)
◎ Loss of combustion air
◎ Fuel supply failure
● Physical safeguards:
◎ Double-walled insulation
◎ Emergency dump chute
◎ Ground-fault protected electricals
Project: Shopping Mall Refurbishment
Location: Kuala Lumpur, Malaysia
Duration: 4 months
Waste Processed: 1.8 tons/day (mainly packaging, temporary walls, flooring)
Results:
● Cost reduction: 55% vs traditional disposal
● Space recovery: Eliminated 6m² daily waste accumulation
● Project timeline: No disposal-related delays
● Sustainability: Contributed to Green Building Index points
● Not suitable for:
◎ Wet waste (>25% moisture)
◎ Asbestos-containing materials
◎ Electronic waste components
● Regulatory note:
◎ Some urban areas require advance permits
◎ Daily operation logs mandatory
The 500kg construction waste incinerator delivers an optimal balance of:
✔ Practical capacity for medium projects
✔ Enhanced combustion efficiency versus smaller units
✔ Basic environmental controls exceeding open burning
✔ Significant cost savings over outsourced disposal
This system represents the ideal solution for general contractors and demolition specialists needing reliable, on-demand waste processing without the complexity of industrial-scale systems. Its combination of portability, improved combustion technology, and operational simplicity makes it particularly valuable for:
● Fast-track projects with tight schedules
● Sites with limited waste storage space
● Companies pursuing sustainability certifications
Address
Qiqiao Town Economic Development Zone, Botou City, Hebei Province, China
Tel
TradeManager
Skype
VKontakte