The 3 tons construction waste incinerator is a compact yet efficient thermal treatment system designed specifically for the construction and demolition (C&D) sector. This system provides an environmentally responsible solution for disposing of various types of construction waste while recovering energy and minimizing landfill dependency.
● Capacity: 3 tons per day (suitable for small to medium construction projects)
● Combustion Temperature: 850–1100°C (ensures complete waste breakdown)
● Modular Design: Easy to transport and install on construction sites
● Fuel Options: Diesel, natural gas, or waste-derived fuels
● Automated Control: PLC system for real-time monitoring of combustion efficiency
● Basic Flue Gas Treatment:
◎ Cyclone separator for particulate removal
◎ Dry scrubber for acid gas neutralization
◎ Bag filter for fine dust capture
● Compliance: Meets basic environmental standards for non-hazardous waste incineration
Waste Compatibility
● Non-hazardous construction waste: Wood, plastics, insulation materials, drywall
● Demolition debris: Painted wood, packaging materials
● Limited hazardous waste: Requires additional permits
Construction projects generate significant amounts of waste, much of which is non-recyclable. The 3-ton incinerator helps by:
● Reducing landfill costs – On-site burning cuts disposal fees by 40–60%
● Minimizing transport needs – No need for frequent waste hauling
● Improving site cleanliness – Immediate waste reduction prevents accumulation
● Lower carbon footprint than landfilling (avoids methane emissions)
● Volume reduction of up to 90% (less ash to dispose of)
● Prevents illegal dumping – Provides a legal, controlled disposal method
● Lower upfront cost compared to larger incinerators
● No need for specialized operators – Simple controls for construction crews
● Potential heat recovery – Can be used for temporary site heating
● Ideal for remote projects where landfill access is limited
● Meets basic emission standards for non-hazardous waste
● Avoids penalties for improper waste disposal
Method |
Cost |
Environmental Impact |
Convenience |
Landfill |
High ($150–300/ton) |
High (methane emissions) |
Requires transport |
Recycling |
Moderate (only for certain materials) |
Low (but limited applicability) |
Sorting needed |
3 tons construction waste incinerator |
Low (after initial investment) |
Moderate (controlled emissions) |
On-site solution |
The 3 tons construction waste incinerator is an economical and practical solution for small to medium construction projects. It offers:
✔ On-site waste reduction – No need for external disposal
✔ Cost savings – Lower operational expenses than landfilling
✔ Basic environmental compliance – Better than open burning or illegal dumping
While not suitable for hazardous materials or large-scale waste, it serves as an efficient tool for managing typical construction debris, helping builders maintain cleaner, more sustainable job sites.
Address
Qiqiao Town Economic Development Zone, Botou City, Hebei Province, China
Tel
TradeManager
Skype
VKontakte