1000kg Construction Waste Incinerator
  • 1000kg Construction Waste Incinerator1000kg Construction Waste Incinerator

1000kg Construction Waste Incinerator

The 1000kg construction waste incinerator represents professional-grade thermal treatment technology for medium to large construction projects. This heavy-duty unit combines industrial-grade combustion efficiency with enhanced environmental controls to meet the demanding requirements of modern construction sites.

The 1000kg construction waste incinerator represents professional-grade thermal treatment technology for medium to large construction projects. This heavy-duty unit combines industrial-grade combustion efficiency with enhanced environmental controls to meet the demanding requirements of modern construction sites.

Technical Specifications:

● Processing Capacity: 1000kg per batch (2-3 batches/day recommended)

● System Dimensions: 3.5m(L)×2.2m(W)×2.8m(H)

● Combustion Performance:

◎ Primary chamber: 800-1000°C (adjustable)

◎ Secondary chamber: 1100-1200°C (≥2 second residence time)

◎ Volume reduction: 90-95%

Advanced Engineering Features:

1. Optimized Combustion System:

◎ Reciprocating stepped grate mechanism

◎ Dual-fuel burner system (diesel/natural gas)

◎ Forced draft combustion with variable speed control

2. Enhanced Pollution Control:

◎ Dry sorbent injection system (lime/activated carbon)

◎ Multi-cyclone particulate collector

◎ Quench chamber for rapid gas cooling

3. Smart Control System:

◎ Industrial PLC with touchscreen interface

◎ Real-time O2/CO monitoring

◎ Automated combustion parameter adjustment

1000kg Construction Waste Incinerator Key Performance Metrics

Parameter

Specification

Fuel Consumption

8-12L diesel/batch

Processing Time

70-90 minutes/batch

Daily Capacity

2-3 tons (8h operation)

Particulate Emissions

<80mg/Nm³

CO Emissions

<120mg/Nm³

1000kg Construction Waste Incinerator Target Applications

Ideal for:

● Mid-to-large building renovations

● Commercial demolition projects

● Infrastructure construction sites

● Disaster recovery operations

Optimal Waste Types:

● Wooden formwork and pallets

● Non-recyclable packaging materials

● Demolition debris (non-asbestos)

● Temporary construction materials

1000kg Construction Waste Incinerator Operational Advantages

Economic Benefits:

● Cost Savings: 60% reduction vs traditional disposal

● Labor Efficiency: 30% faster than smaller units

● Energy Recovery: Optional heat exchange system

Environmental Compliance:

● Meets EU Waste Incineration Directive (WID) standards

● Compliant with OSHA workplace safety requirements

● Exceeds most regional air quality regulations

1000kg Construction Waste Incinerator Comparative Analysis

Feature Comparison:

Feature

1000kg Unit

500kg Unit

Skip Bin

Daily Capacity

2-3 tons

1-1.5 tons

N/A

Operating Cost

$150/ton

$180/ton

$220/ton

Space Required

8m²

6m²

10m²+

Processing Speed

Immediate

Immediate

2-5 day lag

1000kg Construction Waste Incinerator Installation Requirements

Site Preparation:

● Level concrete pad (4m×3m)

● 400V three-phase power connection

● Diesel storage tank (500L recommended)

● 5m safety clearance perimeter

1000kg Construction Waste Incinerator Maintenance Protocol

Daily:

● Ash removal and disposal

● Burner nozzle inspection

● Temperature calibration check

Weekly:

● Grate mechanism lubrication

● Emission system inspection

● Fuel filter replacement

Quarterly:

● Refractory lining evaluation

● Complete flue gas system cleaning

● Safety system testing

1000kg Construction Waste Incinerator Safety Systems

● Multi-stage Protection:

◎ Automatic water deluge system

◎ Pressure relief valves

◎ Flame failure detection

◎ Emergency stop circuit

● Operator Safety:

◎ Thermal insulation jacket

◎ Ground fault protection

◎ Interlocked access doors

1000kg Construction Waste Incinerator Case Study

Project: High-rise Office Renovation

Location: Singapore

Duration: 6 months

Waste Processed: 2.2 tons/day

Results:

● Saved S$58,000 in disposal costs

● Reduced site congestion by 40%

● Achieved BCA Green Mark points

● Zero regulatory violations

1000kg Construction Waste Incinerator Technical Support

● Included Services:

◎ On-site commissioning

◎ Operator training program

◎ First-year maintenance package

● Optional Upgrades:

◎ Remote monitoring system

◎ Waste heat recovery module

◎ Advanced emission monitoring

Conclusion

The 1000kg construction waste incinerator delivers industrial-grade performance for demanding construction environments by offering:

✔ Superior processing capacity for mid-large projects

✔ Enhanced environmental controls beyond basic requirements

✔ Significant operational savings versus traditional disposal

✔ Regulatory compliance for most jurisdictions

This system represents the optimal solution for contractors requiring reliable, high-volume waste processing without the footprint of permanent facilities. Its robust design and advanced features make it particularly suitable for:

● Urban redevelopment projects

● Fast-track construction schedules

● Environmentally sensitive locations

● Companies pursuing sustainability certifications

Hot Tags: 1000kg Construction Waste Incinerator
Send Inquiry
Contact Info
Welcome to our website! For inquiries about our products or pricelist, please leave your email to us and we will be in touch within 24 hours.
X
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy
Reject Accept