The 1000kg construction waste incinerator represents professional-grade thermal treatment technology for medium to large construction projects. This heavy-duty unit combines industrial-grade combustion efficiency with enhanced environmental controls to meet the demanding requirements of modern construction sites.
● Processing Capacity: 1000kg per batch (2-3 batches/day recommended)
● System Dimensions: 3.5m(L)×2.2m(W)×2.8m(H)
● Combustion Performance:
◎ Primary chamber: 800-1000°C (adjustable)
◎ Secondary chamber: 1100-1200°C (≥2 second residence time)
◎ Volume reduction: 90-95%
◎ Reciprocating stepped grate mechanism
◎ Dual-fuel burner system (diesel/natural gas)
◎ Forced draft combustion with variable speed control
◎ Dry sorbent injection system (lime/activated carbon)
◎ Multi-cyclone particulate collector
◎ Quench chamber for rapid gas cooling
3. Smart Control System:
◎ Industrial PLC with touchscreen interface
◎ Real-time O2/CO monitoring
◎ Automated combustion parameter adjustment
Parameter |
Specification |
Fuel Consumption |
8-12L diesel/batch |
Processing Time |
70-90 minutes/batch |
Daily Capacity |
2-3 tons (8h operation) |
Particulate Emissions |
<80mg/Nm³ |
CO Emissions |
<120mg/Nm³ |
Ideal for:
● Mid-to-large building renovations
● Commercial demolition projects
● Infrastructure construction sites
● Disaster recovery operations
Optimal Waste Types:
● Wooden formwork and pallets
● Non-recyclable packaging materials
● Demolition debris (non-asbestos)
● Temporary construction materials
Economic Benefits:
● Cost Savings: 60% reduction vs traditional disposal
● Labor Efficiency: 30% faster than smaller units
● Energy Recovery: Optional heat exchange system
Environmental Compliance:
● Meets EU Waste Incineration Directive (WID) standards
● Compliant with OSHA workplace safety requirements
● Exceeds most regional air quality regulations
Feature |
1000kg Unit |
500kg Unit |
Skip Bin |
Daily Capacity |
2-3 tons |
1-1.5 tons |
N/A |
Operating Cost |
$150/ton |
$180/ton |
$220/ton |
Space Required |
8m² |
6m² |
10m²+ |
Processing Speed |
Immediate |
Immediate |
2-5 day lag |
Site Preparation:
● Level concrete pad (4m×3m)
● 400V three-phase power connection
● Diesel storage tank (500L recommended)
● 5m safety clearance perimeter
Daily:
● Ash removal and disposal
● Burner nozzle inspection
● Temperature calibration check
Weekly:
● Grate mechanism lubrication
● Emission system inspection
● Fuel filter replacement
Quarterly:
● Refractory lining evaluation
● Complete flue gas system cleaning
● Safety system testing
● Multi-stage Protection:
◎ Automatic water deluge system
◎ Pressure relief valves
◎ Flame failure detection
◎ Emergency stop circuit
● Operator Safety:
◎ Thermal insulation jacket
◎ Ground fault protection
◎ Interlocked access doors
Project: High-rise Office Renovation
Location: Singapore
Duration: 6 months
Waste Processed: 2.2 tons/day
Results:
● Saved S$58,000 in disposal costs
● Reduced site congestion by 40%
● Achieved BCA Green Mark points
● Zero regulatory violations
● Included Services:
◎ On-site commissioning
◎ Operator training program
◎ First-year maintenance package
● Optional Upgrades:
◎ Remote monitoring system
◎ Waste heat recovery module
◎ Advanced emission monitoring
Conclusion
The 1000kg construction waste incinerator delivers industrial-grade performance for demanding construction environments by offering:
✔ Superior processing capacity for mid-large projects
✔ Enhanced environmental controls beyond basic requirements
✔ Significant operational savings versus traditional disposal
✔ Regulatory compliance for most jurisdictions
This system represents the optimal solution for contractors requiring reliable, high-volume waste processing without the footprint of permanent facilities. Its robust design and advanced features make it particularly suitable for:
● Urban redevelopment projects
● Fast-track construction schedules
● Environmentally sensitive locations
● Companies pursuing sustainability certifications
Address
Qiqiao Town Economic Development Zone, Botou City, Hebei Province, China
Tel
TradeManager
Skype
VKontakte