Modern urban environments require flexible waste management solutions that adapt to spatial constraints and varying waste volumes. Our Custom size domestic waste incinerator provide cities with precision-engineered combustion systems designed around site-specific requirements, ensuring optimal performance regardless of location limitations.
● Modular design architecture allowing ±30% capacity adjustment
● Site-adaptive footprints from compact 10m² to industrial-scale installations
● Configuration flexibility for vertical/horizontal layouts
● Scalable emission control matching local regulations
Standard Model |
Custom Range |
Typical Application |
5-ton (8m×4m) |
3-7 ton capacity |
Alleyway installations |
20-ton (15m×8m) |
15-25 ton capacity |
Urban periphery |
50-ton (25m×12m) |
40-60 ton capacity |
Industrial parks |
100-ton (35m×18m) |
80-120 ton capacity |
Regional facilities |
● Tower designs (height-focused for <500m² plots)
● Underground combustion chambers with rooftop emissions control
● Mobile modules on ISO container frames
● Rooftop-mounted units for high-density districts
● Variable-length grate systems (3-8 zones adjustable)
● Modular refractory lining with quick-change segments
● Precision air staging for different waste compositions
● Scalable scrubbing systems:
◎ Compact: Dry scrubber + bag filter (30m²)
◎ Standard: Semi-dry + SCR (65m²)
◎ Premium: Full wet scrubber + carbon injection (120m²)
● Plug-and-play energy recovery options:
◎ Steam generation (2-20 t/h)
◎ ORC turbines (200kW-5MW)
◎ Heat exchanger networks
● Constraints: 600m² rooftop installation
● Custom Features:
◎ 8-ton vertical incinerator (18m height)
◎ Noise-encased combustion chamber
◎ Remote monitoring via 5G
● Results:
◎ 92% space efficiency gain
◎ 24/7 operation without disturbance
● Constraints: UNESCO heritage zone
● Custom Features:
◎ Subterranean 15-ton system
◎ Renaissance-style façade integration
◎ Odorless negative-pressure design
● Results:
◎ Zero visual impact
◎ 100% compliance with heritage laws
1. Spatial analysis (3D laser scanning)
2. Waste characterization (2-week sampling)
3. Energy demand mapping
4. Regulatory review
● Digital twin development
● Computational fluid dynamics (CFD) modeling
● Prototype testing (1:10 scale)
● Modular construction (80% prefabrication)
● On-site assembly (30-50% faster than conventional)
Parameter |
Assurance Level |
Capacity |
±5% of design specification |
Emissions |
20% below contracted limits |
Availability |
>91% first-year uptime |
Maintenance |
15% faster access vs standard models |
● Right-sizing savings: 18-22% lower CAPEX vs oversized units
● Energy recovery ROI: 3-5 years (vs 6-8 years for standard)
● Land value preservation: Up to 40% better space utilization
Our Custom size domestic waste incinerator transform urban waste challenges into precision-engineered solutions through:
✅ Architectural integration preserving city aesthetics
✅ Scalable performance matching growth projections
✅ Regulatory-ready designs avoiding compliance risks
● 10-14 weeks for final design
● 6-9 months fabrication
● 8-12 weeks installation
Contact our urban design team for a site-specific proposal within 7 business days.
Address
Qiqiao Town Economic Development Zone, Botou City, Hebei Province, China
Tel